Unlocking Stranded Power and Infrastructure

AI workloads are pushing data centers to the edge of their power capacity. But the real constraint isn't a shortage of megawatts, it's how much of that power gets consumed by cooling instead of compute. This whitepaper shows how single-phase immersion cooling flips that ratio.

Inside, you'll learn:

  • Why air cooling and direct-to-chip liquid cooling hit structural limits as rack densities climb
  • How immersion cooling recovers 6.9 MW of additional usable compute in a fixed 50 MW facility, with no new grid connection required
  • The concrete business case: 21% higher workload throughput, 80 additional racks, and up to €1 billion in cumulative revenue over 15 years
  • How conversion strategy transforms the economics of both existing sites and new builds

Essential reading for anyone making data center investment decisions in an era where power, not floor space, is the scarce resource.